
NFL Denver Broncos
Denver, Colorado
Empower Field at Mile High
HNTB led a design team for the new Empower Field at Mile High, which honors the unique and special traditions of Denver’s original Mile High Stadium. It was designed as a Stadium in the Park integrated into an urban setting that serves as a civic anchor for downtown Denver, complementing the surrounding architecture and landscape. The project was fast-tracked with multiple early demolition, foundations and steel packages to accelerate the schedule — leading to a delivery two weeks ahead of schedule and $4.5M under budget.
Featuring 124 private suites, three stadium clubs, two museums and a retail store, the stadium is host to over 300 non-football events each year. It features more than 76,125 seats, a natural grass playing surface and a range of revenue-generating fan amenities.
Empower Field at Mile High is set to undergo a groundbreaking transformation with a capital improvement project exceeding $100M. This endeavor, the largest in the venue’s history, will redefine the fan experience and elevate the stadium to new heights. Empower Field will feature state-of-the-art upgrades across multiple areas, including video boards, premium hospitality sections, technology, concessions, the Broncos Team Store and ticketing.
Size:
76,125 seats
Services:
Architectural Design
Master Planning
Programming & Benchmark Analysis









